OVERVIEW OF ASSEMBLY


 

Location:       Belgrade
Facility:          Mihajlo Pupin Institite 
Date:              01. september 2009
Contractor:  Tesla systems
 
Institute "Mihajlo Pupin'' (IMP) is the largest and oldest institution in South Eastern Europe. With over 250 employees, mostly engineers (including 7 professors, 32 MSc and 19 PhD) Institute is a leading research institution in Serbia.
 
The first step in the implementation of the system is the measurement of energy networks. Thus the data is obtained that the derived system maximally adapts to conditions prevailing in the electricity network in the building.

 

Figure 1: Measurement of network parameters
 
The second step is the installation of the complete required system for reactive power compensation in our workshop.

The third step is the delivery, installation and commissioning of reactive power compensation system in your facility.
 

Figure 2: Arrival at the transformer station

 

Figure 3: EDB Team turns off the transformer station

 

Figure 4: "Energy" connection for the cabinet for compensation

 

Figure 5: "Signal" connection for the cabinet for compensation

 

Figure 6: Final adjustment of the system




Documents:

LOGIN
you are not logged in
e-mail address:
password:

Forgot your password?   

SEARCH
Enter a word or phrase:

NEWSLETTER
Enter your e-mail address:

TESLA SISTEMI
The team on the field

 


 

 


CATALOG
View the catalog Tesla systems 

 


 

ISO 9001

 

 

ISO 14001

 

 

ISO 18001

 

ISO 20000

 

 

ISO 22301

 

 

ISO 27001

 

 

ISO 50001

 

 

Control Certificate

 

 


 

NIKOLA TESLA
www.tesla-museum.org »